Amistad Chapter 7: one third quilted

It was a very long and tiring day yesterday.

I baked all day long. Two lots of chocolate fudge brownies. Two lots of carrot cake with lemon creamcheese frosting, a big vegetable frittata, 6 chicken and mushroom pies, a gingerbread and date loaf. I had to get more plastic containers to transport them. The orders have gone from 3 items once a fortnight to 5 items per week, so it’s looking hopeful, but on baking day it has me on my feet all day in a small kitchen, having to wash up constantly because I have no space!

I also got the AHQ quilt finished, packed and sent off, in good time to reach HMAS Toowoomba before she sails. I just love waltzing into the post office and plonking down a box they can’t charge me for! Parcels under 2kg to an AFPO are free. I have had to straighten a couple of people out about this, and managers have been called, but they know now at my local…

Screen shot 2014-08-22 at 5.40.39 PMScreen shot 2014-08-22 at 5.41.03 PMWhat I didn’t get a chance to do is work on Amistad. So today, after I sorted out all my tax return paperwork (oh yes, I got that done too!), I sat myself down in a peaceful frame of mind and just got stitching. I’m now about a third through the quilting. It’s getting easier and quicker. I have everything neatly to hand at my sewing table, I rest the hoop on the table edge to save my arms and shoulders, and I have a brilliant LED work light with a magnifying lens for when my eyes get tired. Like now…

Screen shot 2014-08-22 at 5.39.39 PMBack to the needle.